직수입양서 Delay Analysis in Construction Contracts
Hardback, 2nd Edition
Caletka, Anthony F.
Wiley-Blackwell 2015.06.29.
가격
211,660원
18 173,560
YES포인트?
8,680원 (5%) 마니아추가적립
5만원 이상 구매 시 2천원 추가 적립
결제혜택
최대 2,000원 즉시할인

이미 소장하고 있다면 판매해 보세요.

책소개

목차

About the Authors ix



Preface to the Second Edition xi

Preface to the First Edition xiii

1 Introduction 1

1.1 General 1

1.1.1 Purpose of this book 2

1.1.2 Guidance 4

1.1.3 Construction planning and programming 5

1.2 Construction delays 6

1.2.1 Identifying delays 6

1.2.2 Analysing construction delays 7

1.2.3 Delay claim life cycle 9

1.3 Burning issues in delay analysis 10

1.4 Presentation and case study 11

2 Construction Programmes 13

2.1 Introduction 13

2.1.1 Planning, programming and project controls 13

2.1.2 Elements of a successful project 15

2.2 Planning and programming 16

2.2.1 Project planning 17

2.2.2 Work breakdown structure 18

2.3 CPM programming techniques: the fundamentals 21

2.3.1 Activity durations 22

2.3.2 Activity relationships 24

2.3.3 Event date calculations 28

2.3.4 Forward pass 30

2.3.5 Backward pass 32

2.3.6 Total float 34

2.3.7 Constraints 37

2.4 Baseline validation 38

2.4.1 Joint baseline review 38

2.4.2 Programme approval 38

2.4.3 The project baseline 41

2.5 Other planning techniques 41

2.5.1 PERT ? Project Evaluation and Review Technique 41

2.5.2 Gantt charts (bar charts) 43

2.5.3 Line of balance 45

2.5.4 Critical chain method/theory of constraints 47

2.6 Why use CPM planning or scheduling techniques? 49

2.6.1 Project management 49

2.6.2 As-planned programmes 50

2.7 Project controls and the project control cycle 51

2.7.1 Progress monitoring 52

2.7.2 Process and analyse information ? Earned Value Method 54

2.7.3 The cost and schedule performance curves 56

2.7.4 Time control 58

2.7.5 Programme updates 58

2.8 Records, records, records… 64

2.8.1 Electronic records: management and storage 66

2.8.2 Electronic records in practice 67

2.8.3 Document controls 68

2.9 Predatory programming practices 71

2.10 Guidance 72

3 Identification of Construction Delays 73

3.1 Establishing a basis for identifying delay 73

3.1.1 General requirements 74

3.1.2 Validation of an as-planned programme 75

3.2 Factual evidence and as-built programmes 77

3.2.1 As-built programme preparation 78

3.2.2 Summary 86

3.3 Identification of delay events 86

3.3.1 Delay identification 87

3.3.2 Recording delays 89

3.4 Identification and analysis of disruption 92

3.4.1 Disruption and delay 92

3.4.2 Calculating disruption 94

3.4.3 Establishing cause 95

3.4.4 Total cost claims/global claims 97

3.4.5 Measured mile 99

3.4.6 Graphical presentation 103

3.4.7 Summary 109

4 Analysis of Construction Delays 111

4.1 Introduction 111

4.1.1 The use of CPM techniques 111

4.1.2 Project planning software 113

4.1.3 Identifying delays: cause or effect? 115

4.2 Selection criteria and guidance 117

4.2.1 The SCL Delay and Disruption Protocol 118

4.2.2 The core statements of principle 120

4.2.3 AACEI Recommended Practice No. 29R-03: Forensic Schedule Analysis 124

4.2.4 Which technique to use under given circumstances 131

4.3 Summary 132

5 Delay Analysis Techniques 135

5.1 Introduction to delay analysis techniques 135

5.1.1 Additive methods of delay analysis 137

5.1.2 Impacted as-planned 137

5.1.3 Time impact analysis 142

5.1.4 Collapsed as-built 151

5.1.5 As-built based methods of analysis 159

5.1.6 Total time assessments (observational/static/gross) 162

5.1.7 As-planned versus as-built windows analysis 169

5.1.8 Contemporaneous windows analysis 172

5.1.9 Month-to-month update analysis 175

5.2 Summary 180

6 Problematic Issues 183

6.1 Introduction 183

6.2 Float and delay claims 183

6.2.1 General definitions: what is ‘float’? 183

6.2.2 How float is used 184

6.2.3 Float loss and the impact 187

6.2.4 Measurement of float loss 188

6.2.5 Who owns the float? 190

6.3 Concurrency 194

6.3.1 Definitions 195

6.3.2 Delay analysis and Concurrency 196

6.3.3 SCL Delay and Disruption Protocol 205

6.3.4 Delay scenarios 205

6.3.5 Common questions 208

6.3.6 Experience and common sense 209

6.3.7 The concept of pacing 210

6.4 Programme approvals and onerous specifications 211

6.4.1 Programme requirements, format and compliance 211

6.4.2 Approval or acceptance of construction programme 217

6.5 Acceleration and mitigation 218

6.5.1 Mitigation 218

6.5.2 Acceleration 219

6.5.3 Contractors’ right to early completion 221

7 Effective Presentation of Delay Analysis 223

7.1 Introduction 223

7.2 Case study: airport terminal expansion 223

7.2.1 Initial analysis by party-appointed planning experts 224

7.2.2 Using time impact analysis for prolongation 227

7.2.3 Tribunal planning expert’s contemporaneous approach 228

7.2.4 Runway Extension: are delays to the runway extension relevant? 230

7.2.5 Terminal Building: are delays to the terminal building relevant? 231

7.3 Float mapping: approach and methodology 231

7.3.1 Extracting float values 233

7.3.2 Creating a float map 233

7.3.3 Identify driving activities 236

7.3.4 As-built critical path 237

7.4 Demonstrating acceleration 246

7.5 Presentation skills: demonstrative evidence 248

7.5.1 Demonstration 250

7.5.2 Reconstruction 251

7.5.3 Weather 252

7.5.4 Summary 252

Appendix 255

Glossary 259

Table of Cases 267

Index 271

저자 소개

Dr P John Keane, PhD, MSc, FCIOB, FCIArb DipArb has 35 years’ experience in the construction industry and is currently principal of a private consultancy practice. Following training as a quantity surveyor, he graduated into construction and commercial management practice, subsequently holding executive directorships within contracting and professional consulting firms.

In the last 25 years John Keane specialised in the area of dispute resolution and has represented parties in arbitration, adjudication and mediation. He has extensive UK and international experience, particularly in the preparation and delivery of expert witness testimony with regard to delay and programming disputes. He is an experienced arbitrator, author, and speaker. He also lectures to undergraduate and post graduate students on construction law related topics.

Anthony F. Caletka, PE, CFCC, CCM is a civil engineer with over 25 years' experience in construction project and programme management, particularly on large civil engineering projects within the energy, mining, power, and utility sectors, and is a principal in a multinational professional services firm. He establishes governance frameworks, contract strategies, project control systems and tools aligned with global best practice which in turn contribute to the avoidance and resolution of disputes.

Tony is a recognised expert in critical path programming, forensic scheduling, earned value and risk management. He has extensive experience in the delivery of expert witness testimony and advising parties in all dispute resolution forums. He is a frequent speaker and lecturers to post graduate students on project management and forensic scheduling. He was a member of the drafting committee which produced the SCL Delay and Disruption Protocol.

품목정보

발행일
2015년 06월 29일
쪽수, 무게, 크기
288쪽 | 168*246*20mm
ISBN13
9781118631171

첫번째 리뷰어가 되어주세요.

첫번째 한줄평을 남겨주세요.

사락 별점0

혜택 및 유의사항

첫번째 별점을 남겨주세요.

첫번째 밑줄을 남겨주세요.

상품정보안내

직수입외서의 경우, 해외거래처에서 제공하는 정보가 부족하여 제목, 표지, 가격, 유통상태 등의 정보가 미비하거나 변경되는 경우가 있습니다. 정확한 확인을 원하시는 경우, 일대일 상담으로 문의하여 주시면 답변 드리겠습니다.
(판형과 판수 등이 다양한 도서는 찾으시는 도서의 ISBN을 알려 주시면 보다 빠르고 정확한 안내가 가능합니다.)

해외거래처에서 품절인 경우, 2차 거래선을 통해 유럽과 미국 출판사로 직접 수입이 진행될 수 있습니다.
수입 진행 시점으로 부터 2~3주가 추가로 소요되며, 해외에서도 유통이 원활하지 않은 도서는 품절 안내가 지연될 수 있습니다.
해당 경우, 문자와 메일로 별도 안내를 드리고 있사오니 마이페이지에서 휴대전화번호와 메일주소를 다시 한번 확인해주시기 바랍니다.
173,560원
총 1개 173,560원