이미지 검색을 사용해 보세요
검색창 이전화면 이전화면
최근 검색어
인기 검색어

소득공제 수입
직수입양서 Complete Book of Framing
An Illustrated Guide for Residential Construction Paperback, 2nd Edition
Simpson, Scot
RSMeans 2019.04.16.
가격
61,560
18 50,470
YES포인트?
2,530원 (5%) 마니아추가적립
5만원 이상 구매 시 2천원 추가 적립
결제혜택
최대 2,000원 즉시할인

이미 소장하고 있다면 판매해 보세요.

책소개

목차

About the Author xi



Acknowledgments xiii

Introduction xv

Chapter 1: Introduction to Framing 1

Framing Terms 4

Framing Lumber 6

Framing Sheathing 7

Engineered Wood Products 8

Lumber and Wood Structural Panel Grade Stamps 12

Framing Nails 13

Framing Tools 14

The Switch to Cordless Tools 16

Framing Tool Truck 17

Cutting Lumber 18

Protecting Lumber from Decay 19

Preservative Treated Wood 21

Chapter 2: Nailing Patterns 23

Nail Top Plate to Studs 26

Nail Bottom Plate to Studs 26

Nail Double Plate to Top Plate 27

Nail Corner 27

Nail Walls Together or Nail Double Studs 27

Nail Trimmer to Stud 28

Concrete Nailing 28

Nail Bearing and Nonbearing Walls to Floor Perpendicular to Joists 29

Nail Bearing and Nonbearing Walls to Floor Parallel to Joists 29

Nail Header to Stud 30

Nail Let-in Bracing 31

Nail End of Joist 32

Nail Rim Joist 32

Nail Sheathing 33

Nail Built-up Girders and Beams 34

Nail Joist Blocking 34

Nail Lapping Joists 35

Nail Drywall Backing 35

Nail Trusses to Wall 36

Nail Ceiling Joist, Rafters, and Ridge 36

Nail Rafters to Wall 37

Nail Blocks 37

Nail Fascia and Bargeboard 38

Chapter 3: Floor Framing 39

Step 1?Crown and Place Joists 42

Steps 2 and 3?Nail Rim Joists in Place and Cut Joists to Length 43

Step 4?Nail Joists in Place 44

Step 5?Frame Openings in Joists 45

Steps 6 and 7?Block Bearing Walls and Nail Joists to Walls 46

Step 8?Drywall Backing 47

Step 9?Subfloor Sheathing 48

Chapter 4: Wall Framing 49

Step 1?Spread Headers 52

Step 2?Spread Makeup 53

Steps 3?7?Assemble Wall 54

Step 8?Square Wall 55

Step 9?Sheathe Wall 56

Step 10?Install Nail-Flange Windows 57

Steps 11?15?Standing and Setting Wall 58

Step 16?Plumb and Line 59

Framing Rake Walls 62

Chapter 5: Roof Framing 71

Roof Framing Terms 74

Step 1?Finding the Lengths of Common Rafters 76

Step 2?Cut Common Rafter 85

Step 3?Set Ridge Board 88

Step 4?Set Common Rafters 89

Step 5?Find Length of Hip and Valley Rafters 90

Step 6?Cut Hip and Valley Rafters 91

Step 7?Set Hip and Valley Rafters 93

Step 8?Set Jack Rafters 94

Step 9?Block Rafters and Lookouts 95

Step 10?Set Fascia 95

Step 11?Install Sheathing 96

Learning Rafters by Example 97

Ceiling Joists 108

Step 1?Spread Trusses 110

Step 2?Sheathe Gable Ends 111

Step 3?Set Gable Ends 111

Step 4?Roll Trusses 112

Steps 5?8 113

Chapter 6: Doors, Windows, and Stairs 115

Door Framing Terms 118

Installation of Exterior Doors 118

Installation of Nail-Flange Window 121

Installation of Window Flashing 122

Steps for Window Flashing Installation When Windows Installed Before WRB (Weather Resistant Barrier) 123

Steps for Window Flashing Installation When Windows Installed After WRB (Weather Resistant Barrier) 124

Installation of Sliding Glass Doors 125

Installation of Stairs 126

Circular Stairs 131

Chapter 7: Layout 139

Wall Layout 142

Joist Layout 157

Rafter or Truss Layout 159

Roof Layout 159

Chapter 8: Engineered Wood Products 161

Engineered Panel Products 164

Engineered Lumber Products 165

Chapter 9: Wind and Earthquake Framing 185

The Strength of Good Framing 188

Understanding Structural Loads 188

Building Code Load Requirements 189

Regional Considerations 190

Framing Details 190

Hold-Downs 197

Positive Placement Nail Guns 202

Chapter 10: Building Code Requirements 205

Introduction to Building Codes 208

Framing According to Code 212

Protection from Decay 230

Termite Protection 238

Chapter 11: Green Framing 239

Green Framing Feeling 242

Advanced Framing 242

Material Selection 244

Structural Insulated Panels (SIPs) 245

SIP Installation 245

SIP Tools 251

Chapter 12: Preparing for a Job 253

Developing a Job Start Checklist 256

Reviewing the Plans and Making Preparations 259

Organizing the Job Site 263

Chapter 13: Managing the Framing Start 267

Checking Exterior Wall Dimensions 270

Checking Reference Lines for Square 271

Adjusting Reference Lines 272

Checking the Building for Level 274

Chapter 14: Managing a Framing Team 279

Managing Your Team 282

The Role of Lead Framers 283

Quality Control 292

Organizing Tools and Materials 293

Teaching Framers 296

Framing Tips for Every Task 298

Planning and Scheduling 306

Recordkeeping 308

Productivity 310

Chapter 15: Safety 317

Personal Protective Equipment 320

Hand Tools 321

Ladders 323

Fall Protection 323

Rough Terrain Forklift Safety 325

Housekeeping 327

Chapter 16: Healthy Framing 331

Healthy Framing 333

Injuries and Prevention 334

NIOSH Lifting Equation 336

Power Tool Weights 337

Lumber Weight Chart 338

Stretching 339

Noise 340

Glossary 343

Spanish Framing Terms 351

Index 359

저자 소개

Scot Simpson, owned his own construction firm, S.S. Framing in Edmonds, WA, for 36 years until his recent retirement. He developed and refined the methods in this book and used them to train his crews. Scot is the author of two other construction books and numerous articles for construction magazines, such as Fine Homebuilding and the Journal of Light Construction. In addition, he developed and hosted the video, "Resisting the Forces of Earthquakes" with the Earthquake Engineering Research Institute and the International Conference of Building Officials.

품목정보

발행일
2019년 04월 16일
쪽수, 무게, 크기
384쪽 | 216*274*20mm
ISBN13
9781119528524

리뷰/한줄평0

리뷰

첫번째 리뷰어가 되어주세요.

한줄평

첫번째 한줄평을 남겨주세요.

상품정보안내

직수입외서의 경우, 해외거래처에서 제공하는 정보가 부족하여 제목, 표지, 가격, 유통상태 등의 정보가 미비하거나 변경되는 경우가 있습니다. 정확한 확인을 원하시는 경우, 일대일 상담으로 문의하여 주시면 답변 드리겠습니다.
(판형과 판수 등이 다양한 도서는 찾으시는 도서의 ISBN을 알려 주시면 보다 빠르고 정확한 안내가 가능합니다.)

해외거래처에서 품절인 경우, 2차 거래선을 통해 유럽과 미국 출판사로 직접 수입이 진행될 수 있습니다.
수입 진행 시점으로 부터 2~3주가 추가로 소요되며, 해외에서도 유통이 원활하지 않은 도서는 품절 안내가 지연될 수 있습니다.
해당 경우, 문자와 메일로 별도 안내를 드리고 있사오니 마이페이지에서 휴대전화번호와 메일주소를 다시 한번 확인해주시기 바랍니다.
50,470
1 50,470